AV Rack UPS Runtime Estimate

Estimate runtime from total battery-pack capacity and measured rack load, while checking both UPS watt and VA ratings.

VA
W
V

Use the voltage of the complete battery string, not one battery.

Ah

Series batteries add voltage, not amp-hour capacity.

W
%
%
W
Estimated runtime under entered assumptions20minutes
Within VA and watt ratingsYes
Watt load38.9%
VA load25.9%
Nominal pack energy216Wh
Usable output energy119Wh
Estimated pack current17.9A

Check both VA and watt ratings. Runtime uses the entered derating and a linear energy model; the UPS manufacturer's runtime chart is more authoritative when available.

How it works

What to enter: copy both UPS ratings and the total voltage and amp-hour capacity of the complete battery pack. Measure the rack load if possible, then use conservative loss factors.

Calculation. Runtime = pack voltage × pack amp-hours × usable fraction × efficiency ÷ (load + UPS idle draw).

Example. A 24 V, 9 Ah pack contains 216 nominal Wh before discharge-rate, age and conversion losses.

Current-input example

The result above uses these exact values. This snapshot is included when the page is printed so the output can be checked against the original measurements.

UPS VA rating
1500 VA
UPS watt rating
900 W
Total battery-pack voltage
24 V
Pack capacity at that voltage
9 Ah
Measured AV rack load
350 W
Load power factor
0.9
Inverter efficiency
85 %
Usable battery capacity
65 %
UPS internal draw
15 W

Primary result: Estimated runtime under entered assumptions: 20 minutes.

Before using the result

  • Measure from the datum or reference edge described by this tool, and do not mix inside, outside and centerline dimensions.
  • Keep inputs in the displayed units and preserve more precision than the final cutting or purchasing tolerance requires.
  • When the result is close to a limit, verify it with a test piece, field measurement, manufacturer drawing or qualified project professional.

Limitations

Real UPS runtime is non-linear. Discharge rate, chemistry, age, temperature, inverter cut-off, startup surge and firmware matter. Confirm the pack specification and use the manufacturer runtime chart for safety-critical loads.

Frequently asked questions

Why can this estimate exceed the UPS runtime chart?

The usable-capacity factor may be too optimistic. Small lead-acid packs deliver less rated capacity at high current, and ageing reduces it further.