Outils pratiques pour un travail de précision
Calculateur de Coût d'Équipe par Jour & Rémunération à la Tâche
Combinez le coût de main-d'œuvre journalier d'une équipe aux rôles mixtes et comparez-le au revenu attendu à la tâche pour la journée.
Whatever the job is paid on - squares, linear feet, fixtures, etc.
A positive margin means the piece-rate job pays more than this crew's hourly cost for the entered production rate - a negative margin means this crew would earn more on straight hourly work at their blended rate.
Fonctionnement
How to use it: enter your crew's mix of roles and hourly rates, then the job's expected daily production and the piece rate paid per unit - squares of roofing, linear feet of fence, fixtures installed, whatever the job is actually priced on. This tells you whether a piece-rate job is worth more or less than running the same crew on straight hourly pay.
Calculation. Crew cost per day = Σ(role count × role rate) × hours per day. Piece-rate revenue per day = units produced × rate per unit. Margin = piece-rate revenue − crew cost. Effective $/hr = piece-rate revenue ÷ (crew size × hours) - directly comparable to the blended hourly crew rate.
Exemple avec les saisies actuelles
Le résultat ci-dessus utilise exactement ces valeurs. Cet instantané est inclus à l’impression pour comparer la sortie aux mesures d’origine.
- Foremen
- 1
- Foreman rate
- 40 $/hr
- Journeymen
- 2
- Journeyman rate
- 30 $/hr
- Laborers/apprentices
- 1
- Laborer rate
- 20 $/hr
- Hours per day
- 8 hr
- Units produced per day
- 10
- Piece rate per unit
- 90 $
Résultat principal: Crew cost per day: 960.00 $.
Avant d’utiliser le résultat
- Measure from the datum or reference edge described by this tool, and do not mix inside, outside and centerline dimensions.
- Keep inputs in the displayed units and preserve more precision than the final cutting or purchasing tolerance requires.
- When the result is close to a limit, verify it with a test piece, field measurement, manufacturer drawing or qualified project professional.
Limites
This compares crew labor cost against piece-rate revenue only - it doesn't include material, equipment, overhead or profit margin on top; add those separately (see the loaded labor rate calculator for a full cost-stack breakdown of a single role).
Questions fréquentes
What if my crew has more than three roles?
Combine similar rates into the closest category (foreman/journeyman/laborer), or run the tool twice and add the two daily crew costs together for a combined total.
Outils associés
Taux Horaire Chargé
Construisez le coût horaire entièrement chargé et le taux de facturation derrière un salaire brut, avec une décomposition visuelle de la structure de coûts.
Rémunération à la Tâche Toiture
Calculez le coût de main-d'œuvre et de matériel par carré de toiture, à partir de la surface de toit, du taux à la tâche, de la capacité de l'équipe et du facteur de perte.
Générateur de Prix
Construisez un prix de devis à partir de la main-d'œuvre, du matériel, d'autres coûts, des frais généraux, de la provision pour aléas et de la marge cible, avec une structure de coûts visuelle.
Main-d'Œuvre Peinture
Tarifez la main-d'œuvre d'application de peinture au pied carré par couche et estimez le temps d'équipe à partir d'un taux de productivité modifiable.
