Calculadora de Costo Diario de Cuadrilla y Desglose por Tarifa a Destajo

Combine el costo diario de mano de obra de una cuadrilla con roles mixtos y compárelo con el ingreso esperado por tarifa a destajo del día.

$/hr
$/hr
$/hr
hr

Whatever the job is paid on - squares, linear feet, fixtures, etc.

$
Crew cost per day960.00$
Piece-rate revenue per day900.00$
Daily margin-60.00$
Margin-6.7%
Crew size4
Blended crew rate30.00$/hr
Effective $/hr at piece rate28.13$/hr

A positive margin means the piece-rate job pays more than this crew's hourly cost for the entered production rate - a negative margin means this crew would earn more on straight hourly work at their blended rate.

Cómo funciona

How to use it: enter your crew's mix of roles and hourly rates, then the job's expected daily production and the piece rate paid per unit - squares of roofing, linear feet of fence, fixtures installed, whatever the job is actually priced on. This tells you whether a piece-rate job is worth more or less than running the same crew on straight hourly pay.

Calculation. Crew cost per day = Σ(role count × role rate) × hours per day. Piece-rate revenue per day = units produced × rate per unit. Margin = piece-rate revenue − crew cost. Effective $/hr = piece-rate revenue ÷ (crew size × hours) - directly comparable to the blended hourly crew rate.

Ejemplo con los datos actuales

El resultado anterior utiliza exactamente estos valores. Esta captura se incluye al imprimir para cotejar la salida con las medidas originales.

Foremen
1
Foreman rate
40 $/hr
Journeymen
2
Journeyman rate
30 $/hr
Laborers/apprentices
1
Laborer rate
20 $/hr
Hours per day
8 hr
Units produced per day
10
Piece rate per unit
90 $

Resultado principal: Crew cost per day: 960.00 $.

Antes de usar el resultado

  • Measure from the datum or reference edge described by this tool, and do not mix inside, outside and centerline dimensions.
  • Keep inputs in the displayed units and preserve more precision than the final cutting or purchasing tolerance requires.
  • When the result is close to a limit, verify it with a test piece, field measurement, manufacturer drawing or qualified project professional.

Limitaciones

This compares crew labor cost against piece-rate revenue only - it doesn't include material, equipment, overhead or profit margin on top; add those separately (see the loaded labor rate calculator for a full cost-stack breakdown of a single role).

Preguntas frecuentes

What if my crew has more than three roles?

Combine similar rates into the closest category (foreman/journeyman/laborer), or run the tool twice and add the two daily crew costs together for a combined total.