Praktische tools voor nauwkeurig werk
AV-rack UPS Overbruggingstijd
Schat de overbruggingstijd op basis van de totale accucapaciteit en gemeten rackbelasting, met controle van zowel het UPS-wattage als het VA-vermogen.
Use the voltage of the complete battery string, not one battery.
Series batteries add voltage, not amp-hour capacity.
Check both VA and watt ratings. Runtime uses the entered derating and a linear energy model; the UPS manufacturer's runtime chart is more authoritative when available.
Werking
What to enter: copy both UPS ratings and the total voltage and amp-hour capacity of the complete battery pack. Measure the rack load if possible, then use conservative loss factors.
Calculation. Runtime = pack voltage × pack amp-hours × usable fraction × efficiency ÷ (load + UPS idle draw).
Example. A 24 V, 9 Ah pack contains 216 nominal Wh before discharge-rate, age and conversion losses.
Voorbeeld met huidige invoer
Het resultaat hierboven gebruikt precies deze waarden. Deze momentopname wordt bij het afdrukken opgenomen om de uitvoer met de oorspronkelijke metingen te controleren.
- UPS VA rating
- 1500 VA
- UPS watt rating
- 900 W
- Total battery-pack voltage
- 24 V
- Pack capacity at that voltage
- 9 Ah
- Measured AV rack load
- 350 W
- Load power factor
- 0.9
- Inverter efficiency
- 85 %
- Usable battery capacity
- 65 %
- UPS internal draw
- 15 W
Hoofdresultaat: Estimated runtime under entered assumptions: 20 minutes.
Vóór gebruik van het resultaat
- Measure from the datum or reference edge described by this tool, and do not mix inside, outside and centerline dimensions.
- Keep inputs in the displayed units and preserve more precision than the final cutting or purchasing tolerance requires.
- When the result is close to a limit, verify it with a test piece, field measurement, manufacturer drawing or qualified project professional.
Beperkingen
Real UPS runtime is non-linear. Discharge rate, chemistry, age, temperature, inverter cut-off, startup surge and firmware matter. Confirm the pack specification and use the manufacturer runtime chart for safety-critical loads.
Veelgestelde vragen
Why can this estimate exceed the UPS runtime chart?
The usable-capacity factor may be too optimistic. Small lead-acid packs deliver less rated capacity at high current, and ageing reduces it further.
Gerelateerde tools
Versterkervermogen / SPL
Schat het geluidsniveau (SPL) op de luisterpositie en bereken omgekeerd het benodigde vermogen per luidspreker voor een doelwaarde plus headroom.
Zichtlijnen Zitplaatsen
Schat de rijverhoging die nodig is per zichtlijn om over een aangenomen hoofdhoogte in de rij ervoor heen te kunnen kijken.
Buitenbioscoop Scherm
Vergelijk kijkhoeken voor dichtbij en ver weg zittend publiek met schermafmetingen, formaatgrenzen en ideale helderheid voor een donker scherm.
Golfsim Scherm
Pas een beeld met de juiste beeldverhouding in op het inslagscherm binnen de vrije ruimte-afmetingen en bereken het projectieafstandsbereik van de projectorlens.
