Ploegkosten per Dag & Stukloon Uitsplitsing Calculator
Bereken de gemengde dagelijkse arbeidskosten van een ploeg met verschillende functies en vergelijk deze met de verwachte stukloonomzet voor die dag.
Whatever the job is paid on - squares, linear feet, fixtures, etc.
A positive margin means the piece-rate job pays more than this crew's hourly cost for the entered production rate - a negative margin means this crew would earn more on straight hourly work at their blended rate.
How it works
How to use it: enter your crew's mix of roles and hourly rates, then the job's expected daily production and the piece rate paid per unit - squares of roofing, linear feet of fence, fixtures installed, whatever the job is actually priced on. This tells you whether a piece-rate job is worth more or less than running the same crew on straight hourly pay.
Calculation. Crew cost per day = Σ(role count × role rate) × hours per day. Piece-rate revenue per day = units produced × rate per unit. Margin = piece-rate revenue − crew cost. Effective $/hr = piece-rate revenue ÷ (crew size × hours) - directly comparable to the blended hourly crew rate.
Current-input example
The result above uses these exact values. This snapshot is included when the page is printed so the output can be checked against the original measurements.
- Foremen
- 1
- Foreman rate
- 40 $/hr
- Journeymen
- 2
- Journeyman rate
- 30 $/hr
- Laborers/apprentices
- 1
- Laborer rate
- 20 $/hr
- Hours per day
- 8 hr
- Units produced per day
- 10
- Piece rate per unit
- 90 $
Primary result: Crew cost per day: 960.00 $.
Before using the result
- Measure from the datum or reference edge described by this tool, and do not mix inside, outside and centerline dimensions.
- Keep inputs in the displayed units and preserve more precision than the final cutting or purchasing tolerance requires.
- When the result is close to a limit, verify it with a test piece, field measurement, manufacturer drawing or qualified project professional.
Limitations
This compares crew labor cost against piece-rate revenue only - it doesn't include material, equipment, overhead or profit margin on top; add those separately (see the loaded labor rate calculator for a full cost-stack breakdown of a single role).
Frequently asked questions
What if my crew has more than three roles?
Combine similar rates into the closest category (foreman/journeyman/laborer), or run the tool twice and add the two daily crew costs together for a combined total.
Gerelateerde tools
Belast Uurtarief
Bouw het volledig belaste uurtarief en factuurtarief achter een kaal loon op, met een visuele kostenopbouw.
Dakdekker Stukloon
Bereken arbeids- en materiaalkosten per dakvierkant op basis van dakoppervlak, stukloontarief, ploegcapaciteit en verliesfactor.
Offerteprijs Opbouwer
Bouw een offerteprijs op uit arbeid, materiaal, overige kosten, overhead, onvoorzien en gewenste winstmarge, met een visuele kostenopbouw.
Schilderwerk Arbeidskosten
Bepaal de arbeidskosten voor schilderwerk per vierkante voet per laag en schat de ploegtijd op basis van een aanpasbaar productiviteitstempo.