Calculateur de Main-d'Œuvre de Peinture au Pied Carré
Tarifez la main-d'œuvre d'application de peinture au pied carré par couche et estimez le temps d'équipe à partir d'un taux de productivité modifiable.
Use net wall/ceiling area after the deductions you actually allow.
Masking, patching, sanding and setup priced separately from rolling or spraying.
The price and duration are independent checks: the square-foot rate prices the work, while your productivity assumption estimates the schedule.
How it works
How it works: net paintable area is multiplied by coats and your labor rate per square foot per coat. A separate prep allowance is then added.
Schedule = area × coats ÷ productivity ÷ crew size ÷ hours per day. Calibrate both the rate and productivity from completed jobs with similar prep, access and finish requirements.
Current-input example
The result above uses these exact values. This snapshot is included when the page is printed so the output can be checked against the original measurements.
- Paintable surface area
- 2400 sq ft
- Number of coats
- 2
- Application labor rate
- 0.55 $/sq ft/coat
- Prep labor allowance
- 350 $
- Crew size
- 2 people
- Application productivity
- 150 sq ft/person-hour
- Workday length
- 8 hours
Primary result: Total labor price: 2990.00 $.
Before using the result
- Measure from the datum or reference edge described by this tool, and do not mix inside, outside and centerline dimensions.
- Keep inputs in the displayed units and preserve more precision than the final cutting or purchasing tolerance requires.
- When the result is close to a limit, verify it with a test piece, field measurement, manufacturer drawing or qualified project professional.
Limitations
This is a labor-only planning estimate. It excludes paint and sundries, travel, lifts or scaffolding, overtime, taxes, overhead and profit unless those are already embedded in your entered labor rate. Doors, trim, cabinets and detailed cutting-in are usually better priced as separate items.
Frequently asked questions
Does two coats double the paintable area?
It doubles the coated area used for application labor and production time. The one-time prep allowance is not doubled.
Outils associés
Calculateur de Peinture
Calculez la quantité de peinture nécessaire pour vos murs, en tenant compte des portes, fenêtres et couches.
Taux Horaire Chargé
Construisez le coût horaire entièrement chargé et le taux de facturation derrière un salaire brut, avec une décomposition visuelle de la structure de coûts.
Générateur de Prix
Construisez un prix de devis à partir de la main-d'œuvre, du matériel, d'autres coûts, des frais généraux, de la provision pour aléas et de la marge cible, avec une structure de coûts visuelle.
Rémunération à la Tâche Toiture
Calculez le coût de main-d'œuvre et de matériel par carré de toiture, à partir de la surface de toit, du taux à la tâche, de la capacité de l'équipe et du facteur de perte.