Herramientas prácticas para trabajos de precisión
Estimación de Autonomía del SAI para Racks AV
Estime la autonomía a partir de la capacidad total del banco de baterías y la carga medida del rack, comprobando tanto los vatios como los VA nominales del SAI.
Use the voltage of the complete battery string, not one battery.
Series batteries add voltage, not amp-hour capacity.
Check both VA and watt ratings. Runtime uses the entered derating and a linear energy model; the UPS manufacturer's runtime chart is more authoritative when available.
How it works
What to enter: copy both UPS ratings and the total voltage and amp-hour capacity of the complete battery pack. Measure the rack load if possible, then use conservative loss factors.
Calculation. Runtime = pack voltage × pack amp-hours × usable fraction × efficiency ÷ (load + UPS idle draw).
Example. A 24 V, 9 Ah pack contains 216 nominal Wh before discharge-rate, age and conversion losses.
Current-input example
The result above uses these exact values. This snapshot is included when the page is printed so the output can be checked against the original measurements.
- UPS VA rating
- 1500 VA
- UPS watt rating
- 900 W
- Total battery-pack voltage
- 24 V
- Pack capacity at that voltage
- 9 Ah
- Measured AV rack load
- 350 W
- Load power factor
- 0.9
- Inverter efficiency
- 85 %
- Usable battery capacity
- 65 %
- UPS internal draw
- 15 W
Primary result: Estimated runtime under entered assumptions: 20 minutes.
Before using the result
- Measure from the datum or reference edge described by this tool, and do not mix inside, outside and centerline dimensions.
- Keep inputs in the displayed units and preserve more precision than the final cutting or purchasing tolerance requires.
- When the result is close to a limit, verify it with a test piece, field measurement, manufacturer drawing or qualified project professional.
Limitations
Real UPS runtime is non-linear. Discharge rate, chemistry, age, temperature, inverter cut-off, startup surge and firmware matter. Confirm the pack specification and use the manufacturer runtime chart for safety-critical loads.
Frequently asked questions
Why can this estimate exceed the UPS runtime chart?
The usable-capacity factor may be too optimistic. Small lead-acid packs deliver less rated capacity at high current, and ageing reduces it further.
Herramientas relacionadas
Potencia / SPL
Estime el SPL en la posición de escucha y calcule a la inversa los vatios por altavoz necesarios para un objetivo más margen dinámico.
Líneas de Visión
Estime la altura de cada grada necesaria para que la línea de visión libre la altura de cabeza asumida en la fila delantera.
Pantalla de Cine al Aire Libre
Compare los ángulos de visión del público cercano y lejano con las dimensiones de pantalla, los límites de tamaño y el brillo ideal en oscuridad.
Pantalla de Simulador de Golf
Ajuste una imagen de pantalla de impacto con proporción correcta dentro de las dimensiones libres de la sala y calcule el rango de distancia de proyección del lente.