Herramientas prácticas para trabajos de precisión
Calculadora de Tarifa por Pieza para Techado
Calcule el costo de mano de obra y material de techado por cuadro (square) a partir del área del techo, la tarifa por pieza, la capacidad de la cuadrilla y el factor de desperdicio.
Labor pay per 100 sq ft (one "square") of actual roof area.
Shingles/underlayment/fasteners per square. Leave at 0 for labor-only.
Piece-rate labor is paid on actual roof squares; the waste factor applies to material only, since crews aren't paid extra for material that ends up as offcuts.
How it works
How to use it: enter the roof's actual area (not including waste), your piece-rate pay per square (100 sq ft), the crew's realistic daily output, and material cost per square if you want a full job total rather than labor alone.
Calculation. Squares = roof area ÷ 100. Labor cost = squares × piece rate. Material cost = squares × (1 + waste %) × material cost per square - waste applies here because you buy extra material to cover cuts and overlaps, but piece-rate labor is paid on the roof's actual covered area, not the material purchased.
Current-input example
The result above uses these exact values. This snapshot is included when the page is printed so the output can be checked against the original measurements.
- Roof area
- 2500 sq ft
- Piece rate
- 60 $/square
- Crew daily capacity
- 12 squares/day
- Material cost
- 110 $/square
- Material waste factor
- 10 %
Primary result: Total job cost: 4525.00 $.
Before using the result
- Measure from the datum or reference edge described by this tool, and do not mix inside, outside and centerline dimensions.
- Keep inputs in the displayed units and preserve more precision than the final cutting or purchasing tolerance requires.
- When the result is close to a limit, verify it with a test piece, field measurement, manufacturer drawing or qualified project professional.
Limitations
This does not account for steep-roof or complexity premiums (many piece-rate agreements pay more per square above a certain pitch, or for cut-up roofs with lots of valleys/hips), tear-off of existing roofing, or disposal costs - add those as a separate line item.
Frequently asked questions
Should I use the roof's plan area or its actual (sloped) area?
Use the actual sloped roof area - multiply the building's plan (footprint) area by the roof pitch multiplier first if you're starting from a plan measurement, since piece rate and material are both based on the material actually covering the slope.
Herramientas relacionadas
Costo Laboral Cargado
Construya el costo por hora totalmente cargado y la tarifa de facturación detrás de un salario base, con un desglose visual de la pila de costos.
Costo Diario de Cuadrilla
Combine el costo diario de mano de obra de una cuadrilla con roles mixtos y compárelo con el ingreso esperado por tarifa a destajo del día.
Constructor de Oferta
Construya un precio de oferta a partir de mano de obra, material, otros costos, gastos generales, contingencia y margen de ganancia objetivo, con una pila de costos visual.
Mano de Obra de Pintura
Cotice la mano de obra de aplicación de pintura por pie cuadrado por mano, y estime el tiempo de cuadrilla a partir de una tasa de productividad editable.
