Praktische Tools für exaktes Arbeiten
USV-Laufzeit-Schätzung für AV-Racks
Schätzen Sie die Laufzeit aus der gesamten Akkukapazität und der gemessenen Rack-Last und prüfen Sie dabei sowohl die Watt- als auch die VA-Nennleistung der USV.
Use the voltage of the complete battery string, not one battery.
Series batteries add voltage, not amp-hour capacity.
Check both VA and watt ratings. Runtime uses the entered derating and a linear energy model; the UPS manufacturer's runtime chart is more authoritative when available.
How it works
What to enter: copy both UPS ratings and the total voltage and amp-hour capacity of the complete battery pack. Measure the rack load if possible, then use conservative loss factors.
Calculation. Runtime = pack voltage × pack amp-hours × usable fraction × efficiency ÷ (load + UPS idle draw).
Example. A 24 V, 9 Ah pack contains 216 nominal Wh before discharge-rate, age and conversion losses.
Current-input example
The result above uses these exact values. This snapshot is included when the page is printed so the output can be checked against the original measurements.
- UPS VA rating
- 1500 VA
- UPS watt rating
- 900 W
- Total battery-pack voltage
- 24 V
- Pack capacity at that voltage
- 9 Ah
- Measured AV rack load
- 350 W
- Load power factor
- 0.9
- Inverter efficiency
- 85 %
- Usable battery capacity
- 65 %
- UPS internal draw
- 15 W
Primary result: Estimated runtime under entered assumptions: 20 minutes.
Before using the result
- Measure from the datum or reference edge described by this tool, and do not mix inside, outside and centerline dimensions.
- Keep inputs in the displayed units and preserve more precision than the final cutting or purchasing tolerance requires.
- When the result is close to a limit, verify it with a test piece, field measurement, manufacturer drawing or qualified project professional.
Limitations
Real UPS runtime is non-linear. Discharge rate, chemistry, age, temperature, inverter cut-off, startup surge and firmware matter. Confirm the pack specification and use the manufacturer runtime chart for safety-critical loads.
Frequently asked questions
Why can this estimate exceed the UPS runtime chart?
The usable-capacity factor may be too optimistic. Small lead-acid packs deliver less rated capacity at high current, and ageing reduces it further.
Verwandte Tools
Verstärkerleistung / SPL
Schätzen Sie den Schalldruckpegel (SPL) am Hörplatz und rechnen Sie umgekehrt die benötigten Watt pro Lautsprecher für einen Zielpegel plus Headroom.
Sichtlinien
Schätzen Sie die für jede Sichtlinie nötige Reihenhöhe, um eine angenommene Kopfhöhe in der Reihe davor frei zu überblicken.
Freiluftkino-Leinwand
Vergleichen Sie nahe und ferne Betrachtungswinkel des Publikums mit Leinwandmaßen, Größengrenzen und idealer Leinwandhelligkeit bei Dunkelheit.
Golfsimulator-Leinwand
Passen Sie ein seitenverhältnistreues Bild auf die Einschlagleinwand innerhalb der lichten Raummaße ein und berechnen Sie den Projektionsabstandsbereich des Projektors.
