Praktische Tools für exaktes Arbeiten
Akkordlohn-Rechner für Dacharbeiten
Berechnen Sie Arbeits- und Materialkosten je Square für Dacharbeiten aus Dachfläche, Akkordsatz, Teamkapazität und Verschnittfaktor.
Labor pay per 100 sq ft (one "square") of actual roof area.
Shingles/underlayment/fasteners per square. Leave at 0 for labor-only.
Piece-rate labor is paid on actual roof squares; the waste factor applies to material only, since crews aren't paid extra for material that ends up as offcuts.
How it works
How to use it: enter the roof's actual area (not including waste), your piece-rate pay per square (100 sq ft), the crew's realistic daily output, and material cost per square if you want a full job total rather than labor alone.
Calculation. Squares = roof area ÷ 100. Labor cost = squares × piece rate. Material cost = squares × (1 + waste %) × material cost per square - waste applies here because you buy extra material to cover cuts and overlaps, but piece-rate labor is paid on the roof's actual covered area, not the material purchased.
Current-input example
The result above uses these exact values. This snapshot is included when the page is printed so the output can be checked against the original measurements.
- Roof area
- 2500 sq ft
- Piece rate
- 60 $/square
- Crew daily capacity
- 12 squares/day
- Material cost
- 110 $/square
- Material waste factor
- 10 %
Primary result: Total job cost: 4525.00 $.
Before using the result
- Measure from the datum or reference edge described by this tool, and do not mix inside, outside and centerline dimensions.
- Keep inputs in the displayed units and preserve more precision than the final cutting or purchasing tolerance requires.
- When the result is close to a limit, verify it with a test piece, field measurement, manufacturer drawing or qualified project professional.
Limitations
This does not account for steep-roof or complexity premiums (many piece-rate agreements pay more per square above a certain pitch, or for cut-up roofs with lots of valleys/hips), tear-off of existing roofing, or disposal costs - add those as a separate line item.
Frequently asked questions
Should I use the roof's plan area or its actual (sloped) area?
Use the actual sloped roof area - multiply the building's plan (footprint) area by the roof pitch multiplier first if you're starting from a plan measurement, since piece rate and material are both based on the material actually covering the slope.
Verwandte Tools
Vollkosten-Stundensatz
Ermitteln Sie den vollständig belasteten Stundensatz und Verrechnungssatz hinter einem reinen Lohn, mit visueller Kostenaufschlüsselung.
Teamkosten pro Tag
Ermitteln Sie die täglichen Arbeitskosten eines Teams mit gemischten Rollen und vergleichen Sie sie mit dem erwarteten Akkordumsatz des Tages.
Angebotspreis-Ersteller
Erstellen Sie einen Angebotspreis aus Arbeit, Material, sonstigen Kosten, Gemeinkosten, Risikozuschlag und Ziel-Gewinnmarge, mit visueller Kostenstruktur.
Malerlohn
Kalkulieren Sie die Auftragskosten für Malerarbeiten je Quadratfuß und Anstrich und schätzen Sie die Teamzeit anhand einer editierbaren Produktivitätsrate.
